Coated Fabric and Tarpaulin Factory — What We Do In-House
Nine operations under one roof, a batch-linked production record on every order, and an honest line between what we make and what we source.
Nine operations, one production record
| Operation | What it decides | Where it matters |
|---|---|---|
| Fabric selection | Weight, weave, coating, colour fastness | Every downstream specification |
| Pattern making | Fit, panel count, seam positions, waste | Cover and canopy programmes |
| Cutting | Dimensional accuracy and nesting yield | Bulk cost and consistency |
| High-frequency welding | Watertight seams on PVC and laminates | Tank, lagoon and heavy tarp duty |
| Hot-air and sewn seams | Seam strength on coated and canvas cloth | Covers, tarps, marine work |
| Sewing | Stitch density, thread choice, hardware setting | Cover and canvas products |
| Eyeleting and hardware | Pull-out strength and finish | Any tied-down installation |
| Printing | Logo, artwork, batch and lot identification | Retail and programme orders |
| Inspection and packing | What the customer actually receives | All orders |

What we can tell you about your order
Every production run keeps a record: the roll lots consumed, the seam and stitch method, the hardware batch, the inspection result and photographs of the packed goods. If a question arrives six months later, there is an answer with a number in it.
Where a standard is named at quotation, the test report is batch-linked to the delivered goods rather than a generic document from a previous run.
The plant in pictures

Our factory
Production floor and capability.

Quality & Testing
Inspection gates and the standards we work to.

Custom Manufacturing & OEM
How a custom programme runs.

Custom Cover Manufacturer
Covers cut to your product dimensions.
Factory questions
Do you coat the fabric yourselves?
We select and source base cloth and coating from long-term partner mills and run the converting, cutting, welding, sewing, eyeleting, printing and packing in our own plant. Where a process is outside our walls, we say so on the quotation.
Can we audit the factory or arrange an inspection?
Yes. Factory audits and third-party pre-shipment inspection are both accommodated; send the inspection protocol with the order so the line is planned around it.
What is a typical lead time?
Lead time depends on weight, colour, printing and packing specification, so it is quoted per order rather than published as a fixed number. Stock colours and stock weights run fastest.
How is quality controlled?
Incoming roll checks against the specification, in-process checks at weld and seam, and a final inspection with dimensional verification, hardware pull checks and packing-list audit. Reports are batch-linked.
Can you produce to a named standard?
Yes - tell us the standard and the test report your customer must see, and we quote the compound, the treatment and the documentation to match.
